The problem: two documents that live worlds apart.
A review of 1,633 accident reports put a management-of-change failure behind roughly one in eleven; the folklore figure of 80 % has no primary source. Flixborough is the textbook case: a temporary bypass, no change review, 28 dead. The mechanism is always the same shape.
Year 0 · PHAThe Process Hazard Analysis: the systematic study an operations team undertakes to find every credible hazard, for every part of the plant, and the safeguards that stand against it. Every row is true of the plant as built.
Year 1Normal operation.
Year 2 · MOCManagement of Change: the form that asks whether a change is safe, a well tied in, a setpoint moved, a valve relocated. It re-opens the PHA that directly covers the change. Nothing mandates re-opening any other, so the rows elsewhere that rested on the old basis stay as they were.
Year 3The plant runs on a study that is no longer true.
Year 4Still running on it. Somewhere a safeguard is credited with stopping a scenario it no longer can. Nobody knows which.
Year 5 · RevalidationThe next mandated look. If the gap is caught, it is caught here. If a demand came first, it was caught by the plant.
PRINCIPIA ENGINEER · 2 OF 4
The plant, and the engineer
Project Tundra, Oliver County, North Dakota: CO₂ meter stations on the public record, with the downstream documents filled in and labelled.
Our engineer, Cathy. MOC-001 is on her desk. This is what she sees.
LOPA rows for the scenarios the matrix rates at 6 or above
SRS and cause-and-effect for the two shutdown functions
Master alarm database and the DCS copy, one tag drifted on purpose
Historian excursions, a one-page site procedure, and MOC-001
Limits. Sources read: MM0011–MM0017, HAZOP pp. 1–8, recommendations, matrix, filled-in set v3. Rules applied: 20. Not read: anything outside the meter stations. Nothing here is a safety determination; every output is a question to an engineer with the rows attached.