This demo is a full-width dashboard, a recommendation register and a stepper. It needs a desktop-sized screen and a mouse.
← Back to Principia AIThe scorecard is how a site is run from above: a bunch of numbers, each against a target, each tied to the site's budget, its turnaround plan, its insurance premium, its Solomon ranking, etc. Every month the scorecard is reviewed by management.
| ID | Priority | Area | Observation | Recommendation | Moves | Owner | Due · Status |
|---|---|---|---|---|---|---|---|
| R-01 | High | Reliability | Full-stroke proof testing of all SIFs is performed at turnaround only; interval basis not documented. | Establish and implement a documented proof-test program for safety instrumented functions in accordance with the SRS and IEC 61511-1 §16, including the basis for each test interval and provision for partial-stroke testing in service. | SIS proof testsTurnaround intervalMechanical availability | Reliability manager | Q2 2027 In Progress |
| R-02 | High | Alarm management | Alarm rate on console 2 exceeds the site target; several standing alarms observed during the survey. | Ensure the master alarm database is re-rationalised to the site alarm philosophy and ISA-18.2, and that DCS alarm limits are reconciled to the MADB with a documented change record for each difference. | Unplanned downtimeMechanical availability | PSM lead · Operations | Q1 2027 No Progress |
| R-03 | High | Management of change | MOC impact reviews are limited to the originating unit; downstream units are not routinely assessed. | Revise the MOC procedure (SP-003) to require assessment of process safety impacts on downstream and interconnected units, and document the units reviewed on the MOC form. | Unplanned downtimeProduction vs plan | PSM lead | Q4 2026 Under Review |
| R-04 | Medium | Mechanical integrity | Backlog of deferred safety-critical work orders; deferral approvals not consistently recorded. | Develop an auditable process for all deferred safety-critical maintenance and inspection work items, including risk assessment, approval level and planned completion date, and report deferrals to the refinery leadership team monthly. | Maintenance, % RAVMechanical availability | Maintenance director | Q1 2027 In Progress |
| R-05 | Medium | PHA | The 2021 PHA for the diesel hydrotreater has not been revalidated against subsequent changes. | Conduct a revalidation of the PHA for the diesel hydrotreater addressing all changes since February 2021, per the site PHA procedure (P&P 2.0-6), and close out open recommendations 14, 15 and 18. | Mechanical availability | PSM lead | Q3 2027 No Progress |
| R-06 | Medium | Turnaround | Turnaround interval is fixed at four years without a documented reliability or RBI basis. | Establish a documented basis for the turnaround interval using RBI results, SIF proof-test requirements and equipment strategies, and evaluate extension to a six-year cycle. | Turnaround intervalSIS proof tests | Turnaround manager · Inspection | Q2 2027 In Progress |
| R-07 | Low | Operations | Shift handover records do not consistently capture active bypasses and overrides. | Ensure the shift handover log captures all active SIS bypasses and alarm overrides with start time, authorisation and compensating measures, per SP-014. | Unplanned downtime | Operations manager | Q4 2026 Completed |
| R-08 | Low | Metrics | Leading indicators reported to the leadership team are activity-based; no barrier-status indicator is tracked. | Develop and implement a set of leading process safety indicators including safety-critical equipment availability and time in a degraded state, and review them at the monthly operations review. | Mechanical availability | Plant manager · PSM lead | Q2 2027 Under Review |
Each item in the register is aimed at a number Dan watches and lands on a plant Priya runs. Between what he pushes for and what she pushes back with is the reason the number is what it is. It is written nowhere.
Asset A does 40 and runs a six-year cycle. Get Asset B to 40 and we get two turnaround days back. Q2.
I don't know how Asset A gets to 40. Here, PT-1001A feeds the trip and the alarm; take it out of service and we lose both. That's how the 2021 drawing was done.
Asset A had two days. Seven spurious trips on one SIF is an alarm problem. Fix the alarms.
Operators aren't ignoring PAH-1001. Since the tie-in the pressure climbs from alarm to trip in under four minutes. There is nothing to respond to.
Asset A runs 103. Asset B took the same tie-in and lost nine points. Why is Asset B's hydrotreater the problem?
The hydrocracker got the throughput. We got the pressure. Nobody asked us before MOC-001 was signed.
Asset A is at 1.9. Clear the backlog and stop deferring. The number has to come down by year end.
Half the backlog is safety-critical work we deferred to the turnaround because we can't take the unit down twice. Cutting it is not the same as closing it.
If the 2021 study is out of date, revalidate it. That's a compliance item, not a production one.
Three of the documents that study rests on have changed since. Revalidating it is the production item; it's where the four-minute problem gets fixed.
Asset A runs six. Same design, same age. Move to six and we bank a year of production.
I don't know what sets Asset A's cycle. Ours is set by the full-stroke tests we can't do in service. Extend the cycle and we extend past the SRS interval.
Low priority. Log formatting.
Five of the seven trips happened with a bypass active. Which compensating measure was in place is on a paper permit.
More indicators. We already have forty.
The indicator we don't have is the one that would have shown SIF-101 degraded for 41 days before the trips started.
Everything Dan is shown is real, and every recommendation Priya receives is well written. What does not exist is the capacity to reason across the two sites at once.
Dan's numbers, in the dashboard he already reads. Start from the two plants: choose them, compare them, open the scorecard. Click a metric and it says what is the case at Asset B that is not the case at Asset A, why that produces the differential, and what it would take to move it. The rows beneath are the documents each reason rests on, and whether each can be changed, follows from something else, or is already obsolete.