PRINCIPIA MANAGER · 1 OF 4

The problem: two plants, same design, different numbers.

The scorecard is how a site is run from above: a bunch of numbers, each against a target, each tied to the site's budget, its turnaround plan, its insurance premium, its Solomon ranking, etc. Every month the scorecard is reviewed by management.

D
Dan, VP Operationsowns both scorecards · answers for the gap to the leadership team · about to ask a consultancy why Asset B is six tiles behind
Asset AOPERATIONS SCORECARD · SEPTEMBER · SAME DESIGN
Mechanical availability
97.4 %
target 96.0
+0.3 vs last year · 12-mo rolling
Oct 24Sep 25
Production vs plan
103 %
plan 100
plan = 100 · monthly
Oct 24Sep 25
Unplanned downtime
2.1 d
budget 4.0 d
YTD · cumulative
Oct 24Sep 25
Turnaround interval
6 yr
last 3 cycles
next TA Q2 2029 · RBI cycle 2019
Oct 24Sep 25
SIS proof tests
40 / yr
2021 → now
partial-stroke in service · full stroke at TA
Oct 24Sep 25
Maintenance, % RAV
1.9 %
Q1 ≤ 1.5
trailing 12 mo · top quartile 1.5
Oct 24Sep 25
SAP PM · PI · EHS export 10/01Power BI · refreshed nightly
Asset BOPERATIONS SCORECARD · SEPTEMBER · SAME CRUDE
Mechanical availability
93.4 %
target 96.0
−2.9 vs last year · 12-mo rolling
Oct 24Sep 25
Production vs plan
94 %
plan 100
plan = 100 · monthly
Oct 24Sep 25
Unplanned downtime
11.2 d
budget 4.0 d
YTD · 7.9 on one unit
Oct 24Sep 25
Turnaround interval
4 yr
last 3 cycles
next TA Q1 2027 · fixed cycle
Oct 24Sep 25
SIS proof tests
120 / yr
2021 → now
full stroke at TA · no partial-stroke
Oct 24Sep 25
Maintenance, % RAV
3.4 %
Q1 ≤ 1.5
trailing 12 mo · top quartile 1.5
Oct 24Sep 25
SAP PM · PI · EHS export 10/01Power BI · refreshed nightly
To address the differential, Dan employs a consultancy. Fourteen weeks later its recommendation register arrives. He hands it to the reliability manager of Asset B.
PRINCIPIA MANAGER · 2 OF 4

Meet Priya, our reliability manager.

P
Priya, reliability manager, Asset Bowner of R-01, R-04 and R-06 · reports to the maintenance director · reviewed monthly by the leadership team
Mechanical availability
93.4%
Production vs plan
94%
Unplanned downtime
11.2d
Turnaround interval
4yr
SIS proof tests
120/yr
Maintenance, % RAV
3.4%
Reliability & Process Safety Gap Assessment · Asset B · Recommendation RegisterRev 3 · 62 recommendations · 8 shown · SMART · status per LMA IGRES 2024/001
IDPriorityAreaObservationRecommendationMovesOwnerDue · Status
R-01HighReliabilityFull-stroke proof testing of all SIFs is performed at turnaround only; interval basis not documented.Establish and implement a documented proof-test program for safety instrumented functions in accordance with the SRS and IEC 61511-1 §16, including the basis for each test interval and provision for partial-stroke testing in service.SIS proof testsTurnaround intervalMechanical availabilityReliability managerQ2 2027
In Progress
R-02HighAlarm managementAlarm rate on console 2 exceeds the site target; several standing alarms observed during the survey.Ensure the master alarm database is re-rationalised to the site alarm philosophy and ISA-18.2, and that DCS alarm limits are reconciled to the MADB with a documented change record for each difference.Unplanned downtimeMechanical availabilityPSM lead · OperationsQ1 2027
No Progress
R-03HighManagement of changeMOC impact reviews are limited to the originating unit; downstream units are not routinely assessed.Revise the MOC procedure (SP-003) to require assessment of process safety impacts on downstream and interconnected units, and document the units reviewed on the MOC form.Unplanned downtimeProduction vs planPSM leadQ4 2026
Under Review
R-04MediumMechanical integrityBacklog of deferred safety-critical work orders; deferral approvals not consistently recorded.Develop an auditable process for all deferred safety-critical maintenance and inspection work items, including risk assessment, approval level and planned completion date, and report deferrals to the refinery leadership team monthly.Maintenance, % RAVMechanical availabilityMaintenance directorQ1 2027
In Progress
R-05MediumPHAThe 2021 PHA for the diesel hydrotreater has not been revalidated against subsequent changes.Conduct a revalidation of the PHA for the diesel hydrotreater addressing all changes since February 2021, per the site PHA procedure (P&P 2.0-6), and close out open recommendations 14, 15 and 18.Mechanical availabilityPSM leadQ3 2027
No Progress
R-06MediumTurnaroundTurnaround interval is fixed at four years without a documented reliability or RBI basis.Establish a documented basis for the turnaround interval using RBI results, SIF proof-test requirements and equipment strategies, and evaluate extension to a six-year cycle.Turnaround intervalSIS proof testsTurnaround manager · InspectionQ2 2027
In Progress
R-07LowOperationsShift handover records do not consistently capture active bypasses and overrides.Ensure the shift handover log captures all active SIS bypasses and alarm overrides with start time, authorisation and compensating measures, per SP-014.Unplanned downtimeOperations managerQ4 2026
Completed
R-08LowMetricsLeading indicators reported to the leadership team are activity-based; no barrier-status indicator is tracked.Develop and implement a set of leading process safety indicators including safety-critical equipment availability and time in a degraded state, and review them at the monthly operations review.Mechanical availabilityPlant manager · PSM leadQ2 2027
Under Review
Priority: High = close within 12 months · Medium = 24 months · Low = ongoingStatus: In Progress · No Progress · Under Review · Completed · Superseded · Rejected · Withdrawn
The report from the consultancy connects Dan's numbers to Priya's protocol and gives recommendations to Dan on how to improve protocol to drive the numbers. The result: Dan pushing for changes to an on-site reality he doesn't fully understand, for reasons he does; Priya pushing back on changes to a protocol she does understand, for reasons she doesn't.
PRINCIPIA MANAGER · 3 OF 4

The same recommendation, from both ends.

Each item in the register is aimed at a number Dan watches and lands on a plant Priya runs. Between what he pushes for and what she pushes back with is the reason the number is what it is. It is written nowhere.

R-01 · High · Reliability · owner Reliability manager · due Q2 2027 · In Progress
Consultant's recommendation
Establish and implement a documented proof-test program for safety instrumented functions in accordance with the SRS and IEC 61511-1 §16, including the basis for each test interval and provision for partial-stroke testing in service.
observation: Full-stroke proof testing of all SIFs is performed at turnaround only; interval basis not documented.
numbers it moves
Mechanical availability
Asset B93.4 %Asset A97.4 %
Turnaround interval
Asset B4 yrAsset A6 yr
SIS proof tests
Asset B120 / yrAsset A40 / yr
Dan's sideVP Operations
SIS proof tests · 120 / yr

Asset A does 40 and runs a six-year cycle. Get Asset B to 40 and we get two turnaround days back. Q2.

The differential · what neither can say
Asset A tests in service because its alarm and trip read separate transmitters. Asset B cannot, because of a design choice on sheet D-2104. Asset A's practice does not transfer; the target as set will not be met, and the report does not say why.
lives in: P&ID D-2104 zone C-9 · SRS-101 Rev B · the 2021 PHA row 1.5.2 · Priya's memory · not in the report
Priya's sideReliability manager, Asset B

I don't know how Asset A gets to 40. Here, PT-1001A feeds the trip and the alarm; take it out of service and we lose both. That's how the 2021 drawing was done.

left: what the register says and which numbers it is aimed at · middle: the reason, stated nowhere · each side: what one person knows and the other cannot see
The information is in the opposition. Nobody can read it.

The gap is not data. It is reasoning.

Everything Dan is shown is real, and every recommendation Priya receives is well written. What does not exist is the capacity to reason across the two sites at once.

PRINCIPIA MANAGER · 4 OF 4

The same scorecard, with the reasoning kept.

Dan's numbers, in the dashboard he already reads. Start from the two plants: choose them, compare them, open the scorecard. Click a metric and it says what is the case at Asset B that is not the case at Asset A, why that produces the differential, and what it would take to move it. The rows beneath are the documents each reason rests on, and whether each can be changed, follows from something else, or is already obsolete.

Portfolio › Refining › Asset B vs Asset A
compare
ledger as of 30 Sep 2025changeable 0obsolete 0derived 0inherent 0
sources: PI · SAP PM · MADB · ChangeFlow · PHA / LOPA · SRS · P&ID
Principia Manager. Do business safely.The number, the reason, and what it would take, on one dashboard.